Applications
- Air conditioning and heat pumps: pipes to the outdoor unit
- Ventilation: ducts through a wall or floor
- Plumbing: drains and water pipes
- Electrical: cables and cable routes between rooms and floors
The right diameter
Diameters range from 8 to 162 mm. The hole has to fit the pipe, duct or cable that goes through it, with room for a seal or sleeve.
Not sure about the size yet? Say in your request what needs to go through the hole.
Wall, floor or ceiling
Holes can be drilled in walls, floors and ceilings of concrete, reinforced concrete and masonry. For a floor or ceiling, what lies underneath and where the drilling water can go matter too.
Depending on the job, the drilling is wet or dry.
Before drilling
BoorTechniek MKA assesses the surface and the application first, and checks the spot for pipes and cables. If something is unclear, work stops until it has been sorted out.
Does the hole go through reinforcement or a load-bearing wall or floor? Have the structural engineer decide first whether that is possible.
What to send for a quote
- the project address
- what goes through the hole: pipe, duct or cable
- the material, and wall, floor or ceiling
- the diameter, depth and number of holes
- photos of both sides of the drilling spot
You can do that through the quote form, with photos attached.
